Restumping Permits and Rules in Victoria
Restumping and reblocking are structural work, so a building permit is needed before work starts. Work must be done by a registered building practitioner regardless of its value.
We connect you with BPC-registered building practitioners
Request a free on-site quote
We'll be in touch in less than 24 hours
How it works
Fill out the quick form
As much or as little detail as you like. Photos of cracks or floors help.
We text you
We say hi and ask a few quick questions.
A registered builder inspects your home
They check the subfloor, the stumps and measure floor levels.
Get a written, itemised quote
Stump count, materials, permits and engineering, all spelled out.
Review the contract
Happy with it? Sign the contract. Victorian rules set deposit limits and a cooling-off period.
Permit, then the works
The builder supports the house, replaces the stumps and re-levels the floor.
Final inspection and sign-off
Your building surveyor issues a Certificate of Final Inspection.
Check builder registration
Restumping or reblocking must be done by a registered building practitioner regardless of the value of the work. Consumer Affairs Victoria
The BPC registration classes include Domestic Builder (Limited to Re-stumping and Re-blocking). Check a builder's registration class and conditions on the register. BPC builder classes
Search the BPC register before you engage a practitioner. BPC register
Permit and building surveyor
Restumping, reblocking and underpinning are structural work and need a building permit before work starts. Victorian council guidance
The homeowner chooses the building surveyor, private or council. A builder may recommend one but cannot appoint a private surveyor on the owner's behalf. Victorian Government Gazette
Permit documentation typically includes stump layout, stump type and footing details, and engineering where required. Council restumping guidelines
Contracts signed before and from 1 July 2026
For eligible contracts signed from 1 July 2026, Home Warranty applies to domestic building work over $20,000, replacing the old Domestic Building Insurance scheme. For earlier contracts, check the insurance arrangements applicable when the contract was signed. BPC Home Warranty guidance
A major domestic building contract is required for work over $10,000. Maximum deposit: 10% under $20,000, 5% at $20,000 or more. The usual cooling-off period is 5 business days. Victorian Government Gazette
Statutory building warranties apply by law and cannot be signed away. Consumer Affairs Victoria
Handover checklist
Keep the Certificate of Final Inspection, permit and approved plans, signed contract and variations, Home Warranty Notice of Cover where applicable, engineering documents and any written guarantee.
At completion, expect a Certificate of Final Inspection from the building surveyor. Victorian Government Gazette
Home Warranty by contract date
| Contract signed | Cover to check |
|---|---|
| Before 1 July 2026 | Check the domestic building insurance arrangements applicable when the contract was signed. |
| From 1 July 2026 | For eligible domestic building work over $20,000, Home Warranty applies. Check the Notice of Cover. |