Restumping Cost Melbourne
Published guides put a full restump of a typical Melbourne weatherboard house at around $12,000 to $30,000. A registered builder's written quote after an inspection is the price to rely on.
We connect you with BPC-registered building practitioners
Restumping price guide
Restumping and reblocking replace stumps beneath a raised house. The final scope depends on the condition of the subfloor, soil, access and permits.
Published Melbourne restumping guide ranges
| Work | Published guide range |
|---|---|
| Per stump, supplied and installed | Around $300 to $900 |
| Partial restump | From around $5,000 |
| Full restump, typical weatherboard house | Around $12,000 to $30,000 |
| Permit and engineering | Allow around $1,500 to $3,000 |
Published Melbourne price guides, October 2026. Your builder's written quote is the price to rely on.
Why quotes differ
- Stump count and the extent of partial or full restumping
- Subfloor clearance and access
- Footing depth and soil conditions
- Rotten bearers or joists and the amount of re-levelling
- Plaster and door adjustments, permits and engineering
How to compare quotes
- Request a written, itemised scope showing stump count, materials, footings, re-levelling, permits and engineering.
- Check whether rotten timbers, plaster and door adjustments are included.
- Ask how variations will be agreed. Compare the same scope across builders.
Published Melbourne price guides, October 2026. Your builder's written quote is the price to rely on.
Related cost guides

Request a free on-site quote
We'll be in touch in less than 24 hours
How it works
Fill out the quick form
As much or as little detail as you like. Photos of cracks or floors help.
We text you
We say hi and ask a few quick questions.
A registered builder inspects your home
They check the subfloor, the stumps and measure floor levels.
Get a written, itemised quote
Stump count, materials, permits and engineering, all spelled out.
Review the contract
Happy with it? Sign the contract. Victorian rules set deposit limits and a cooling-off period.
Permit, then the works
The builder supports the house, replaces the stumps and re-levels the floor.
Final inspection and sign-off
Your building surveyor issues a Certificate of Final Inspection.